Cisco Unified Computing System - Call PBM IT Solutions at (888) 233-6471


Q. What is a building management system (BMS)?
A. In larger data centers, the building management system (BMS) allows for constant and centralized monitoring of the facility, including temperature, humidity, power and cooling.

In a data center, servers, storage and network devices must be properly maintained and upgraded. This includes operating systems, security patches, applications and system resources such as memory, storage and CPUs.

Energy costs are rising for most data centers. Companies should employ tools and techniques to manage the energy cost curve.

Beyond backup and recovery protection, ensuring maximum data center availability and uptime is clearly crucial to a business’s success. Business Continuity seldom goes beyond the planning stage at most companies, however, until downtime or data loss hit.

Virtual machines offer many benefits: server consolidation, increased utilization and faster recovery times after failure.

Virtualization was first introduced in the 1960s by IBM to boost utilization of large, expensive mainframe systems by partitioning them into logical, separate virtual machines that could run multiple applications and processes at the same time. In the 1980s and 1990s, this centrally shared mainframe model gave way to a distributed, client-server computing model, in which many low-cost x86 servers and desktops independently run specific applications.

The most basic method of backing up your data is on a simple floppy disk. However, this method is essentially obsolete, as it is difficult to even by a computer which includes a floppy disk drive these days. With CD-Rs and now DVD-Rs being cheaper than ever, it is possible to store far more data on a single disk than was ever possible with a floppy disk.

The Cisco Unified Computing System enables more dynamic and agile data centers, in which server identity (MAC addresses, worldwide names [WWNs], firmware and BIOS revisions, network and storage connectivity profiles and policies, etc.) can be dynamically provisioned or migrated to any physical server within the system.

The recent attention on Green IT technologies has opened new career opportunities for IT professionals. Since some of the areas need specialized attention such as energy efficiency, environmental laws and ethical disposal, some organizations have created new positions and divisions to embrace this upcoming trend.

An High Availability Data solution must be practical to implement - minimizing acquisition cost and operational complexity while being able to efficiently scale-out to meet any performance requirement as business needs evolve.

A broad group of industry-leading partners supports the open, standards-based unified fabric architecture of the Cisco Nexus 5010 Switch. This switch also delivers more than 500 Gbps of switching capacity with 20 fixed wirespeed 10 Gigabit Ethernet ports that support Data Center Ethernet and FCoE. In addition, one expansion port supports 8-port 1/2/4 Gigabit Fibre Channel, 4-port 10 Gigabit Ethernet (Data Center Ethernet and FCoE) and 4-port 1/2/4 Gigabit Fibre Channel, and 6-port 10 Gigabit Ethernet (Data Center Ethernet and FCoE).