Cisco Consultant Shop in Connecticut, CT:


Fairfield County Hartford County Litchfield County Middlesex County New Haven County New London County Tolland County Windham County


About Cisco Data Center Solutions by PBM IT - Call (888) 233-6471.


Cisco Data Center Solutions provided by PBM IT offer the best data storage, data backup, unified computing, green IT, and high-availability data services in Southern California.

Q. What is a data center?
A. A data center is where the majority of an enterprise servers and storage are located, operated and managed.

Per-rack power requirements constrain the number of racks a data center can support. A typical 10,000 - 20,000 sq. ft. facility designed for 50 - 100 watts/sq. ft requires 1/2 megawatt to 2 megawatts of power. Availability and cost of utility power in the megawatt range is expensive and difficult to obtain. Supporting infrastructure - generators, ATS, UPS, and distribution equipment - also are costly. Careful planning and growth projections must be maintained to ensure power requirements can be met.

Energy costs are the fastest-rising cost element in the data center cost portfolio.

Operating a Data Center not only requires a comprehensive skill set, but also a little forethought into the overall industry landscape.

The usual goal of virtualization is to centralize administrative tasks while improving scalability and work loads.

IT has found as the most compelling tool is virtualization technology.

A storage management solution should address the protection of recoverable as well as unrecoverable information. The need to protect unrecoverable data is obvious — unless this data is protected, it must be manually recreated if it is lost. As for recoverable data, although it may be recoverable through reinstallation, the process can be extremely time-consuming and costly. To reinstall an updated application, users must install the application plus all the updates. In addition, all preferences and options need to be reset to their exact state prior to the loss.

Within the Cisco UCS M71KR-E, M71KR-Q, and M81KR adapter types, the Cisco Unified Computing System can enable a fabric failover capability in which loss of connectivity on a path in use will cause remapping of traffic through a redundant path within the Cisco Unified Computing System. In determining the adapter type to use to support the Cisco Nexus 1000V Series, the interface count available to the VMware ESX host is a key factor.

Green IT, or otherwise known as Green Computing is the concept of building computer hardware and software system with the minimal impact to the environment.

The data storage system may further include a third arbiter for controlling communication of data from the first storage processor and the second storage processor to a third group of disk drives of the disk drive array. Selected data isredundantly stored on disk drives in the first group of disk drives, the second group of disk drives and, the third group of disk drives such that, upon failure of the first arbiter, the selected data is available to the first storage processor and thesecond storage processor through the second and third arbiters.

Next-generation data centers have specific server networking needs, and the Cisco Nexus 5010 one-rack unit (RU) switch provides an Ethernet-based unified fabric that's designed to meet those needs.

Go back