We find "the right" Data Center solution by working with you through a 5-Step process:

    1. Review your business processes and existing IT infrastructure to determine specific data center requirements.
    2. Identify the data center services that best fit your specific requirements.
    3. Present Cisco data center equipment and service options.
    4. Clearly identify the strengths and weaknesses of each data center equipment and service option based on your requirements.
    5. Oversee implementation of your data center solution until your desired result is achieved.

Call us at (888) 233-6471 for a FREE consultation with a Cisco Solutions Consultant who will review your business data center requirements and recommend next steps.

Featured Solution: Cisco Data Center Design & Implementation


Q. What is a building management system (BMS)?
A. In larger data centers, the building management system (BMS) allows for constant and centralized monitoring of the facility, including temperature, humidity, power and cooling.

In a data center, servers, storage and network devices must be properly maintained and upgraded. This includes operating systems, security patches, applications and system resources such as memory, storage and CPUs.

Gradually raise the temperature at the server inlet point to run up to 24 degrees Celsius (75 degrees Fahrenheit), but use sensors to monitor hot spots and supplementary cooling, if required.

Operating a Data Center not only requires a comprehensive skill set, but also a little forethought into the overall industry landscape.

Virtualization can be viewed as part of an overall trend in enterprise IT that includes autonomic computing, a scenario in which the IT environment will be able to manage itself based on perceived activity, and utility computing, in which computer processing power is seen as a utility that clients can pay for only as needed.

Virtualization can optimize fewer servers to run at higher performance levels.

If users are to embrace client backup, the backup process must be transparent. Users must be able to continue to work with little or no interruption. There must be protection while the computer is disconnected from the network, and there must be automatic storage management synchronisation when the computer is reconnected to the network. New or changed data should be replicated immediately to the disk drive whenever a file is saved or closed.

The Cisco Unified Computing System streamlines data center resources to reduce total cost of ownership, scales service delivery to increase business agility, and radically reduces the number of devices requiring setup, management, power, cooling, and cabling.

Green IT facilities offer employees a healthy, comfortable work environment. In addition, green facilities enhance relations with local communities.

Data storage systems are used in a variety of businesses for the purpose of storing and maintaining data which is critical to the operation of the businesses and their customers. It is very important that such data storage systems be highlyreliable to minimize or eliminate the chance of losing data if the system fails. The most secure and reliable systems employ total redundancy, in which every component of the system is replicated, such that, upon a failure of a component, anothercomponent takes over operation, so that the data storage system can remain fully functional. For example, two storage processors may be provided in a system such that if one fails, the other assumes the operation of the failed processor as well asmaintaining its own. However, total redundancy is expensive and can be an inefficient use of system resources.